Cultural destination

Soudah Development

Soudah Development is a development and tourism project in the Asir region of south-western Saudi Arabia, overseen by Soudah Development Company, which is wholly owned by the Public Investment Fund, with a development area spanning 636.5 square kilometres that covers Soudah and parts of Rijal Almaa. It was launched on 24 February 2021 with investments exceeding SAR 11 billion, and its master plan, named “Soudah Peaks”, comprises six development zones and three phases above the highest peak in the Kingdom at an elevation of 3,015 metres above sea level.

The official logo of Soudah Development: a square geometric emblem of diagonal lattice with an inner triangle above horizontal bars inspired by Asir pattern, above the name in Arabic (السودة للتطوير) and English (Soudah Development), in dark brown on a softly blurred cream background.
Image credits
Image attribution: Soudah Development Company, “Soudah Development Logo.svg”, Public domain (UsageTerms: Public domain), via Wikimedia Commons (original source credited in the file: https://soudah.sa/en/). / شركة السودة للتطوير (Soudah Development Company)، «Soudah Development Logo.svg»، ملكية عامة (Public domain — UsageTerms: Public domain)، عبر ويكيميديا كومنز (المصدر الأصلي المذكور في الملف: https://soudah.sa/en/). · License: Public domain
The official logo of Soudah Development: a square geometric emblem of diagonal lattice with an inner triangle above horizontal bars inspired by Asir pattern, above the name in Arabic (السودة للتطوير) and English (Soudah Development), in dark brown on a softly blurred cream background.

Overview

Soudah Development is a development and tourism project in the Asir region of south-western Saudi Arabia, overseen by Soudah Development Company, which is wholly owned by the Public Investment Fund, with a development area spanning 636.5 square kilometres that covers Soudah and parts of Rijal Almaa.[1]

The project was launched by His Royal Highness Prince Mohammed bin Salman bin Abdulaziz, Crown Prince and Prime Minister and Chairman of the Public Investment Fund, on 24 February 2021, with investments exceeding SAR 11 billion.[1] Its master plan is named “Soudah Peaks”; it comprises six development zones and three phases, and the destination aims to receive approximately two million tourists annually by 2030.[1][3]

Establishment and Governance

The project was launched on 24 February 2021 to develop Soudah and parts of Rijal Almaa in the Asir region, with investments exceeding SAR 11 billion.[1]

Soudah Development Company is wholly owned by the Public Investment Fund. Its board of directors is chaired by His Royal Highness the Crown Prince and Prime Minister, with the Minister of Culture as vice-chairman and a number of Their Excellencies and Their Highnesses as members, and Engineer Saleh Al-Oraini serves as chief executive officer.[1]

Location and Area

The development area lies in Soudah and parts of Rijal Almaa in the Asir region, and covers an area of 636.5 square kilometres.[1]

The Soudah Peaks destination sits above the highest peak in Saudi Arabia at an elevation of 3,015 metres above sea level, and it extends across wide areas over the towering mountain peaks of Soudah and Rijal Almaa.[2] The built-up area does not exceed 3.6% of the project area, and it is distributed across six development zones.[2]

Mountain Environment

The project is set in a high mountain environment in Soudah and Rijal Almaa, extending across wide areas over the towering mountain peaks of the Asir region.[2]

The site's elevation of 3,015 metres above sea level, the height of the highest peak in the Kingdom, is its foremost natural asset and places it among the highest mountain locations in Saudi Arabia.[2]

The Soudah Peaks Master Plan

His Royal Highness Prince Mohammed bin Salman bin Abdulaziz, Crown Prince and Prime Minister and Chairman of the Board of Soudah Development Company, launched on 25 September 2023 the master plan for the development of Soudah and parts of Rijal Almaa under the name “Soudah Peaks”, a luxury mountain tourism destination above the highest peak in the Kingdom at an elevation of up to 3,015 metres above sea level.[3]

The master plan comprises six principal zones in distinct locations, namely Tahlal, Sahab, Sabrah, Jareen, Rijal and Red Rock, and it consists of three main phases, the first of which is expected to be completed in 2027.[3] The first phase includes the development of 940 hotel rooms, 391 residential units and 32,000 square metres of commercial space.[3]

The project is in line with the Public Investment Fund's efforts to enable promising vital sectors, and it supports the Asir region development strategy.[3]

Tourism and nature

Heritage and Antiquities

The Heritage Commission, in cooperation with Soudah Development Company, announced the results of joint archaeological survey work that identified 20 unique rock outcrops bearing archaeological engravings in the Soudah Peaks project area. These sites are among the oldest cultural evidence in the region, containing engravings and rock drawings estimated to be between 4,000 and 5,000 years old.[4]

The survey work came under a memorandum of understanding signed between the Heritage Commission and Soudah Development Company, covering survey and excavation in the project area across four scientific phases. It began with data collection and analysis of the sites, and concluded with the documentation and identification of the high-value sites in preparation for their development and protection.[4]

Economic and Development Impact

The project's investments exceed SAR 14 billion, including more than SAR 3 billion for infrastructure development.[2]

Its contribution to cumulative gross domestic product is expected to exceed SAR 29 billion by 2033, alongside the creation of 10,700 direct and indirect job opportunities by the same year, and a target of receiving approximately two million tourists annually by 2030.[1][2]

Frequently Asked Questions

Q: What is Soudah Development? A: It is a development and tourism project overseen by Soudah Development Company, which is wholly owned by the Public Investment Fund. Its development area spans 636.5 square kilometres, covering Soudah and parts of Rijal Almaa in the Asir region.[1]

Q: When was the project launched? A: On 24 February 2021, with investments exceeding SAR 11 billion.[1]

Q: What is the elevation of the Soudah Peaks destination? A: 3,015 metres above sea level, above the highest peak in Saudi Arabia.[2]

Q: What are the main components of the master plan? A: Six development zones and three phases; the first phase includes 940 hotel rooms, 391 residential units and 32,000 square metres of commercial space, and it is expected to be completed in 2027.[3]

Q: What archaeological discoveries have been made in the project area? A: 20 unique rock outcrops bearing archaeological engravings estimated to be between 4,000 and 5,000 years old were identified, as part of an archaeological survey carried out in four scientific phases.[4]

Related topics

Sources & references

  1. Soudah Development Company — “About Soudah Development”
  2. Soudah Development Company — “Soudah Peaks”
  3. Soudah Development Company — Newsroom: “The Crown Prince launches the Soudah Peaks master plan”
  4. Heritage Commission (Ministry of Culture) — “Discovery of 20 unique rock engravings in the Soudah Peaks project”